Customization: | Available |
---|---|
Application: | Power, Electronic, Instrument, Lighting, Rectifier, Audio, Power Distribution System |
Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
On load tap changer transformer plays an important role in power system.It can not only stabilize the load center voltage, but also connect the power grid, adjust load current, improve reactive power distribution etc.Its basic principle is to lead out several taps from the coil on one side of the transformer, and switch from one tap to another through OLTC, without cutting off the load current.So as to change the effective number of turns and achieve the purpose of voltage regulation.
Rated capacity(kVA) | High voltage(kV) | High voltage tapping range(%) | Low voltage(kV) | Vector Group symbol | No-load Loss (kW) |
On-load Loss (kW) |
No-load Loss (kW) |
On-load Loss (kW) |
Short-circuit resistance (%) |
No-load Current (%) |
Model 11 | Model 18 | |||||||||
3150 | 35 38.5 |
±2 × 2.5 ±3 × 2.5 ±4 × 2.5 |
6.3 10.5 |
Yd11 |
3.04 | 23.08 | 2.4 | 21.9 | 7 |
0.72 |
4000 | 3.62 | 27.36 | 2.9 | 25.9 | 0.72 | |||||
5000 | 4.32 | 31.35 | 3.5 | 29.7 | 0.68 | |||||
6300 | 5.25 | 35.06 | 4.2 | 33.3 | 8 | 0.68 | ||||
8000 | 7.2 | 38.48 | 5.8 | 36.5 | 0.6 | |||||
10000 | 8.7 | 45.32 | 7.0 | 43 | 0.6 | |||||
12500 | 10.08 | 53.87 | 8.0 | 51.1 | 0.56 | |||||
16000 | 12.16 | 65.84 | 9.7 | 62.5 | 0.54 | |||||
20000 | 14.4 | 79.52 | 11.5 | 75.5 | 0.54 | |||||
25000 | 17.02 | 94.05 | 13.6 | 89.6 | 10 | 0.45 | ||||
31500 | 20.22 | 112.86 | 16.2 | 106.4 | 0.4 |
1. Are you manufacturers ? We are a professional factory with 10 years experience in the field of High and low Voltage switch-gears, Substation,transformers,cable distribution box and various electrical equipment, such as vacuum circuit breaker , load break switch etc. |
2. Do you accept customized serveice ? We offer OEM/ODM service , can print your logo on product . our professional technical and quotation team can provice a satisfied project according to your drawing and parameters |
3. What is your terms of payment ? T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and pack-ages before you pay the balance. |
4. Can your product be customerized ? Considering differences in voltage. frequency and other speciality of transformer product in different countries and regions,our product can be customerized according to your requirements. |
5. How do you solve quality problems? Please porvide detailed photoes of quality problems. our technical and quality testing department will analyse.we will make asatisfied soluton within 1 days . |